Getting started: from drawing to estimate
Drop in a drawing and you get line items with quantities, unit prices and the reason for each number, plus a draft estimate. The result is a draft. Before sending it to a client, check the estimated (yellow) rows and the cover page.
Five steps to an estimate
- Drop in the drawings
Drop in your PDF, DXF or JWW drawings together. A single floor plan is enough to start. The software sorts the pages, measures the rooms and builds the line items. - Press “Send to Estimate”
Review the estimate step and press “Send to Estimate”. The Estimate app opens. - Press “Import”
Press “Import” in the notice at the top of the Estimate app. - Press “Add selected rows”
Untick the rows you do not need and press “Add selected rows”. Rows found in your company price list use those prices. - Press “Save Excel & add to log”
The estimate is created in Excel and added to the estimate log. For a PDF, press “Print preview / PDF” and then “Save PDF”.
The software only stops when there is a red row or a red page, where it could not produce a number.
What the colours mean
| Green | Measured from the drawing, or written on it (finish schedule, door and window schedule, etc.). |
|---|---|
| Yellow (estimate) | Not on the drawing, so worked out from floor area, perimeter, number of floors or typical amounts in past estimates. The reason appears under the row and in the estimate notes. This is what to check. |
| Red | The software could not produce a number. Enter one, or remove the row if it is not part of this job. |
| Grey (suggestion) | A suggestion not included in the total. Tick “Use” to add it. |
Check before sending to a client
- Project name, site, client and construction period on the cover
- How rooms are split and ceiling heights (click a row to highlight it on the drawing)
- The scale of each page
- Yellow rows with large amounts
- Work by other contractors (electrical, plumbing): use “Exclude” to take it out of the total
- Unit prices (enter your own in the company price list and they are used from then on)
Using it for renovations (interior or exterior)
Renovation drawings contain few quantities, so most rows (about 90%) are estimates (yellow). The software counts the rows it can take from the drawings. Equipment and furniture chosen by product number (kitchens, bathrooms, air conditioners, built-in furniture) come out as candidates or estimates, so plan to check the products and the site and correct them. For exterior renovation without drawings, enter the perimeter and number of floors on the first screen.
What it is not good at
- Scanned or hand-drawn drawings can be misread (room names, scale). Drawings exported from CAD are more accurate.
- Foundation and structural quantities are estimates when there are no structural drawings.
- It does not take site conditions, discounts or current market prices into account.
About the 14-day free trial / FAQ
← Back to G-NEST Estimating